The museum recognizes the support of Municipality of Middlesex Centre and their 2021 Council Grant Program. In 2021, using our grant we have begun a project to replace a portion of the wood deck at the rear of the Station building with a concrete walkway. This project is ongoing. As well, the southeast portion of the wood deck has been removed, in preparation for engineering and deck replacement. Ground preparation (excavation and gravel) was started for a brick or concrete apron at the front of the large exhibits building (“the barn”). A portion of the funds were used for urgent repairs to the roof of our baggage car which had started to leak in several places due to failure of old roof patches. Some vandalism repairs were also done on or around the baggage car.